Planning a New Product Introduction Into an Already-Loaded Network
A manufacturer must introduce a new product family into a plant network already running near capacity, without breaking existing customer commitments.
Run on Niyojan · Production Planning

Available capacity is not evenly distributed, and finding it requires modelling the whole network rather than each plant.
Network Capacity Modelling → Commitment Protection → Ramp Scenario Solving → Tooling and Qualification Sequencing
Capacity for the introduction found by modelling the network rather than surveying plants.
The challenge
Available capacity is not evenly distributed, and finding it requires modelling the whole network rather than each plant.
New product ramp curves are uncertain, so a single-point plan is fragile.
Existing commitments cannot be disturbed to make room, but nobody can prove which ones are at risk.
How our team solved it, with Niyojan
- 01
Network Capacity Modelling
Niyojan models available capacity across the whole plant network rather than assessing plant by plant.
- 02
Commitment Protection
Existing customer commitments are held as hard constraints so any feasible plan preserves them.
- 03
Ramp Scenario Solving
Several ramp curves are solved so the introduction plan holds however demand actually develops.
- 04
Tooling and Qualification Sequencing
Tooling, qualification, and material lead times are sequenced against the ramp rather than assumed available.
- 05
Plan Approval
The operations planning lead approves the chosen introduction plan, and Niyojan commits it with its capacity assumptions recorded.
The outcome
- Available capacity is not evenly distributed, and finding it requires modelling the whole network rather than each plant.
- New product ramp curves are uncertain, so a single-point plan is fragile.
- Existing commitments cannot be disturbed to make room, but nobody can prove which ones are at risk.
- Capacity for the introduction found by modelling the network rather than surveying plants.
- Existing commitments preserved as hard constraints rather than hoped for.
- An introduction plan that holds across several ramp scenarios.
Delivered for a client; the client name is withheld under NDA. References are available on request.
Capabilities used
Every accelerator is assembled from the same capability layer, so a workflow you adopt here shares its foundation with the rest of the portfolio.
Run on Niyojan
Watch Niyojan run, end to end, in a few minutes.

Multi-plant production planning at enterprise scale.
See the Niyojan acceleratorMore from Niyojan

Global 60+ Plant Capacity Balancing and Workload Re-Allocation
A multinational industrial equipment manufacturer operating 60+ production facilities across 4 continents, producing custom hydraulic pumps, valves, and heavy gearboxes.
Read the use case
Dynamic Resequencing Following Unplanned Primary Line Failure
A high-volume automotive stamping and welding plant producing body panels for 3 concurrent vehicle assembly platforms.
Read the use case
Setup Grouping and Changeover Minimization in Contract Electronics
A high-mix Contract Electronics Manufacturer (CEM) operating 12 Surface Mount Technology (SMT) lines producing PCBA boards for automotive and industrial IoT clients.