Wayam AI
Technology and SaaSIT OperationsClient project

Legacy Code Refactoring and Technical Debt Remediation Acceleration

A 15 year old enterprise logistics software company with a large monolithic codebase consisting of 2 million lines of legacy Java and JavaScript code.

Run on Sahay · Engineering Cost & TCO

A tangled mass being combed out into parallel ordered rails
18 monthslegacy modernization execution timeline cut
55%application maintenance overhead reduced
The problem2 min read

Technical debt accumulated over a decade, making minor feature additions risky and time consuming for engineering teams.

What we did, with Sahay

Complexity and Coupling Analysis → Modularization Playbooks → Code Modernization → Regression Safety Harnesses

The result

Legacy modernization execution timeline cut from 18 months to 4 months.

The challenge

01

Technical debt accumulated over a decade, making minor feature additions risky and time consuming for engineering teams.

02

Developers feared modifying legacy modules due to tight coupling, undocumented side effects, and lack of test coverage.

03

Refactoring proposals were routinely rejected by management because manual code modernization was estimated to take 18 months and $3M.

How our team solved it, with Sahay

  1. 01

    Complexity and Coupling Analysis

    Sahay maps code dependencies, cyclomatic complexity, and dead code paths across the monolithic repositories.

  2. 02

    Modularization Playbooks

    Sahay generates step by step refactoring plans that decouple monolithic modules into standalone services without downtime.

  3. 03

    Code Modernization

    Deprecated API calls are upgraded, legacy syntax is modernized, and modern asynchronous patterns are applied.

  4. 04

    Regression Safety Harnesses

    Test harnesses are placed around legacy modules before refactoring so behavior does not regress during migration.

  5. 05

    Debt ROI Tracking

    Maintenance hours saved and infrastructure cost reductions are measured for each completed refactoring.

  6. 06

    Tech Lead Merge Approval

    The module's tech lead reviews each refactoring change and its harness results and approves the merge.

The outcome

Before
  • Technical debt accumulated over a decade, making minor feature additions risky and time consuming for engineering teams.
  • Developers feared modifying legacy modules due to tight coupling, undocumented side effects, and lack of test coverage.
  • Refactoring proposals were routinely rejected by management because manual code modernization was estimated to take 18 months and $3M.
After, with Sahay
  • Legacy modernization execution timeline cut from 18 months to 4 months.
  • Application maintenance overhead reduced by 55%, freeing senior engineers for new product development.
  • Eliminated 350,000 lines of dead, deprecated, and unreachable legacy code.

Delivered for a client; the client name is withheld under NDA. References are available on request.

Capabilities used

Every accelerator is assembled from the same capability layer, so a workflow you adopt here shares its foundation with the rest of the portfolio.

system connectorsanomaly detectionroot cause reasoningforecastingworkflow orchestration

Run on Sahay

Watch Sahay run, end to end, in a few minutes.

Engineering Cost & TCO

Connect architecture decisions to what they actually cost to run.

See the Sahay accelerator

More from Sahay

Bring us the version of this that you actually have.

Every engagement is fixed in scope and milestone-gated. The scoping conversation starts with your systems, not with a template.