Early Detection of Port Congestion Shocks and Dynamic Ocean Freight Rerouting
A global consumer electronics manufacturer importing component sub-assemblies from Asian supplier hubs into North American and European manufacturing plants.
Run on Purti · Supply Chain

Unexpected port labor strikes and canal blockages caused ocean shipping lead times to double from 21 days to 45 days without warning.
Maritime Signal Monitoring → Predictive ETA Recalculation → Stockout Exposure Mapping → Rerouting Recommendations
3-week advance visibility into maritime port congestion shocks.
The challenge
Unexpected port labor strikes and canal blockages caused ocean shipping lead times to double from 21 days to 45 days without warning.
Supply chain planners relied on delayed freight forwarder email updates, learning of container delays only after ships were queued at anchor.
Unannounced container delays caused assembly line shutdowns at downstream electronics assembly plants, costing $150,000/day in idle labor.
How our team solved it, with Purti
- 01
Maritime Signal Monitoring
Purti ingests satellite AIS vessel tracking, port congestion metrics, labor strike news, and customs throughput data in real time.
- 02
Predictive ETA Recalculation
Purti recalculates container arrival ETAs continuously, flagging 14 delayed shipments 3 weeks before port arrival.
- 03
Stockout Exposure Mapping
Part numbers in delayed containers are mapped against plant BOM schedules, identifying 4 high-value customer orders at risk.
- 04
Rerouting Recommendations
Purti evaluates alternative routes and recommends air freight for critical component buffers while rerouting the remaining containers to secondary ports.
- 05
Planner Approval
The supply chain planning lead reviews the rerouting and air freight plan and approves it.
- 06
Carrier Booking Dispatch
Approved booking changes are sent directly to logistics carriers via API.
The outcome
- Unexpected port labor strikes and canal blockages caused ocean shipping lead times to double from 21 days to 45 days without warning.
- Supply chain planners relied on delayed freight forwarder email updates, learning of container delays only after ships were queued at anchor.
- Unannounced container delays caused assembly line shutdowns at downstream electronics assembly plants, costing $150,000/day in idle labor.
- 3-week advance visibility into maritime port congestion shocks.
- Zero assembly line downtime, achieved by air-freighting critical component buffers before stockouts occurred.
- $2.1M saved in customer SLA delivery penalties and factory idle labor costs.
Delivered for a client; the client name is withheld under NDA. References are available on request.
Capabilities used
Every accelerator is assembled from the same capability layer, so a workflow you adopt here shares its foundation with the rest of the portfolio.
Run on Purti
Watch Purti run, end to end, in a few minutes.

Supply-chain disruption prediction.
See the Purti acceleratorMore from Purti

Raw Material Price Volatility and Supply Disruption Mitigation in Steel Fabrication
A heavy industrial equipment manufacturer consuming over 100,000 tons of structural steel plate and alloy tubing annually across four fabrication facilities.
Read the use case
Predicting Tier-2 and Tier-3 Supplier Insolvency and Operational Risk in Automotive
An automotive OEM sourcing critical precision castings, rubber seals, and specialized fasteners from a complex network of 1,200 Tier-2 and Tier-3 suppliers.
Read the use case
Dynamic Safety Stock and Reorder Point Optimization in Retail Distribution
A national retail chain operating 12 regional distribution centers (DCs) supplying 400 retail store locations with 30,000 SKUs.
Read the use caseBring us the version of this that you actually have.
Every engagement is fixed in scope and milestone-gated. The scoping conversation starts with your systems, not with a template.